Greenfield Bay Bridge: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 21: | Line 21: | ||
| data7 = [[North Lannex]] {{small|(3740, -3480)}} | | data7 = [[North Lannex]] {{small|(3740, -3480)}} | ||
| label8 = Location {{small|(Center)}} | | label8 = Location {{small|(Center)}} | ||
| data8 = | | data8 = 1875, -3850 | ||
}} | }} | ||
| header3 = Characteristics | | header3 = Characteristics | ||
Line 30: | Line 30: | ||
| data10 = 1.44 mi (2.32 km) | | data10 = 1.44 mi (2.32 km) | ||
| label11 = Height {{small|(Towers)}} | | label11 = Height {{small|(Towers)}} | ||
| data11 = | | data11 = 308 ft (94 m) | ||
| label12 = Maximum clearance below | | label12 = Maximum clearance below | ||
| data12 = | | data12 = 118 ft (36 m) | ||
}} | }} | ||
}} | }} |
Revision as of 23:54, 4 September 2022
Greenfield Bay Bridge | |
---|---|
<< pending render >> | |
Information | |
Status | Complete (West end unfinished) |
Introduced | 0.5.4 |
Carries | 6 lanes of I-205 (3 eastbound, 3 westbound) |
Toll | Eastbound, 9 lanes (7 cash, 2 express) |
Location | |
Begins | North of Sunnyside (1465, -3950) |
Ends | North Lannex (3740, -3480) |
Location (Center) | 1875, -3850 |
Characteristics | |
Design | Cable-stayed |
Total length | 1.44 mi (2.32 km) |
Height (Towers) | 308 ft (94 m) |
Maximum clearance below | 118 ft (36 m) |
bridge across the bay