Greenfield Bay Bridge: Difference between revisions

From Greenfield Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 21: Line 21:
| data7 = [[North Lannex]] {{small|(3740, -3480)}}
| data7 = [[North Lannex]] {{small|(3740, -3480)}}
| label8 = Location {{small|(Center)}}
| label8 = Location {{small|(Center)}}
| data8 = 1830, -3190
| data8 = 1875, -3850
}}
}}
| header3 = Characteristics  
| header3 = Characteristics  
Line 30: Line 30:
| data10 = 1.44 mi (2.32 km)
| data10 = 1.44 mi (2.32 km)
| label11 = Height {{small|(Towers)}}
| label11 = Height {{small|(Towers)}}
| data11 = 328 ft (100 m)  
| data11 = 308 ft (94 m)  
| label12 = Maximum clearance below
| label12 = Maximum clearance below
| data12 = 98 ft (30 m)
| data12 = 118 ft (36 m)
}}
}}
}}  
}}  

Revision as of 23:54, 4 September 2022

Greenfield Bay Bridge
<< pending render >>
Information
StatusComplete (West end unfinished)
Introduced0.5.4
Carries6 lanes of I-205 (3 eastbound, 3 westbound)
TollEastbound, 9 lanes (7 cash, 2 express)
Location
BeginsNorth of Sunnyside (1465, -3950)
EndsNorth Lannex (3740, -3480)
Location (Center)1875, -3850
Characteristics
DesignCable-stayed
Total length1.44 mi (2.32 km)
Height (Towers)308 ft (94 m)
Maximum clearance below118 ft (36 m)

bridge across the bay

Gallery