Greenfield Bay Bridge: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
| data3 = 6 lanes of [[I-205]] {{small|(3 eastbound, 3 westbound)}} | | data3 = 6 lanes of [[I-205]] {{small|(3 eastbound, 3 westbound)}} | ||
| label13 = Toll | | label13 = Toll | ||
| data13 = Eastbound, | | data13 = Eastbound, 10 lanes {{small|(7 cash, 3 express)}} | ||
}} | }} | ||
| header2 = Location | | header2 = Location |
Revision as of 23:58, 4 September 2022
Greenfield Bay Bridge | |
---|---|
<< pending render >> | |
Information | |
Status | Complete (West end unfinished) |
Introduced | 0.5.4 |
Carries | 6 lanes of I-205 (3 eastbound, 3 westbound) |
Toll | Eastbound, 10 lanes (7 cash, 3 express) |
Location | |
Begins | North of Sunnyside (1465, -3950) |
Ends | North Lannex (3740, -3480) |
Location (Center) | 1875, -3850 |
Characteristics | |
Design | Cable-stayed |
Total length | 1.44 mi (2.32 km) |
Height (Towers) | 308 ft (94 m) |
Maximum clearance below | 118 ft (36 m) |
bridge across the bay