Greenfield Bay Bridge

Revision as of 16:53, 4 September 2022 by BriLila (talk | contribs)

bridge across the bay

Greenfield Bay Bridge
<< pending render >>
StatusComplete (West end unfinished)
TypeTransportation
BeginsNorth of Sunnyside (1465, -3950)
EndsNorth Lannex (3740, -3480)
Location1830, -3190
Introduced0.5.4
CarriesI-205
Number of Lanes6 (3 eastbound, 3 westbound)
Total length1.44 mi (2.32 km)
Height (At maximum level)328 ft (100 m)
Maximum clearance below98 ft (30 m)
Built ByGreenfield Administration Team
DesignCable-stayed
TollEastbound, 9 lanes (7 cash, 2 express)

Gallery