Greenfield International Airport: Difference between revisions

Line 93: Line 93:


Due to this, most international traffic comes from Los Angeles or San Francisco which are both roughly 2 hour drives away. If a relatively large plane does decide to land here, they must use a high autobrake setting, and if one takes off here, full thrust is always required (regardless of runway condition) and the brakes are required to be held onto until the engine reaches full thrust.
Due to this, most international traffic comes from Los Angeles or San Francisco which are both roughly 2 hour drives away. If a relatively large plane does decide to land here, they must use a high autobrake setting, and if one takes off here, full thrust is always required (regardless of runway condition) and the brakes are required to be held onto until the engine reaches full thrust.
[[File:UPS MD-11F at GIA.png|thumb|250x250px|A UPS MD-11 Freighter at GIA viewed from the control tower]]
[[File:UPS MD-11F at GIA.png|thumb|300x300px|A UPS MD-11 Freighter at GIA viewed from the control tower]]
There have been cases of runway overruns due to unfavourable conditions resulting from the short runways, most notably [[Golden Pacific Flight 8]] which overran the runway during a strong crosswind and crashed through the eastern airport fences and onto [[I-205]]. This prompted a complete closure of said section for 2 weeks and resulted in heavy traffic in the [[Lannex]] roads due to diversion.
There have been cases of runway overruns due to unfavourable conditions resulting from the short runways, most notably [[Golden Pacific Flight 8]] which overran the runway during a strong crosswind and crashed through the eastern airport fences and onto [[I-205]]. This prompted a complete closure of said section for 2 weeks and resulted in heavy traffic in the [[Lannex]] roads due to diversion.


Line 102: Line 102:


=== Hotel ===
=== Hotel ===
[[File:View of GIA T1 apron from airport hotel.png|thumb]]
The airport hotel, named GoFly, was opened in 2013. Construction originally started in 2006, but the economic slowdown has halted its construction due to a large cost overrun. It has 11 floors, and is within a short walking distance to the airport terminals.


=== Ground transportation ===
=== Ground transportation ===
212

edits