Greenfield International Airport: Difference between revisions

Jump to navigation Jump to search
m
Line 102: Line 102:


=== Hotel ===
=== Hotel ===
[[File:View of GIA T1 apron from airport hotel.png|thumb]]
[[File:View of GIA T1 apron from airport hotel.png|thumb|View of Terminal 1 apron from the hotel]]
The airport hotel, named GoFly, was opened in 2013. Construction originally started in 2006, but the economic slowdown has halted its construction due to a large cost overrun. It has 11 floors, and is within a short walking distance to the airport terminals.
The airport hotel, named GoFly, was opened in 2013. Construction originally started in 2006, but the economic slowdown has halted its construction due to a large cost overrun. It has 11 floors, and is within a short walking distance to the airport terminals.


212

edits

Navigation menu