26
edits
No edit summary |
No edit summary |
||
| Line 4: | Line 4: | ||
=== History === | === History === | ||
The assembly plant was built in 2 main phases, the first one start in 1968 and finishes in 1976, it consisted in 3 buildings one warehouse, a machining plants specialized in the manufacturing of nozzles and turbine fans and a molding unit that molded engine combustor and compressor caps. In the early 90's, the rising income made by Cleman Corporation and It's fusion with Novock corporation pushes the new conglomerate to expand the plant and radically change it's purposes. During the late 90's and early 2000's the plant's floor area nearly tripled, it was granted offices for on site research and administration, the molding unit was moved in the machining unit, a new warehouse was created to recept jet engine part that weren't made on site. the leftover molding unit building was transformed in a jet engine final assembly line while the new enormous B3 was specialized in assembling plane engine parts. Since 2008 the plant is one of the primary sites of Novock Cleman SA and assembles recent jet engine models. | The assembly plant was built in 2 main phases, the first one start in 1968 and finishes in 1976, it consisted in 3 buildings one warehouse, a machining plants specialized in the manufacturing of nozzles and turbine fans and a molding unit that molded engine combustor and compressor caps. In the early 90's, the rising income made by Cleman Corporation and It's fusion with Novock corporation pushes the new conglomerate to expand the plant and radically change it's purposes. During the late 90's and early 2000's the plant's floor area nearly tripled, it was granted offices for on site research and administration, the molding unit was moved in the machining unit, a new warehouse was created to recept jet engine part that weren't made on site. the leftover molding unit building was transformed in a jet engine final assembly line while the new enormous B3 was specialized in assembling plane engine parts. Since 2008 the plant is one of the primary sites of Novock Cleman SA and assembles recent jet engine models. | ||
=== Gallery === | |||
[[File:In game overview.png|thumb|Complex overview in game]] | |||
[[File:Building3.png|thumb|Engine parts assembly plant aside jet engine assembly unit (right) and warehouse 2 (left) with warehouse 1 and machining/molding units building in the background]] | |||
[[File:Assemblyunit1.png|thumb|jet engine parts assembly lines]] | |||
[[File:Jet Engine Assembly line .png|thumb|Final assembly line in the former molding unit building]] | |||
[[File:Building3andsea .png|thumb|Assembly lines building and warehouse 3 with Greenfield bay in the background]] | |||
edits